Sunday, June 22, 2014

It's June and Summer's here

June 2014


It's summer and hot! Time to get busy and get this thing done. :)


Here's the cabinet underneath the bed. Betcha can't guess what's inside.
Pull this out and you're ready to go!
Got the heat shield finished
for the gas light





























Wheel bearings packed, and fender wells tidied up. Almost ready to roll!
Now that's a classy picture there.



The new skin is sitting in my garage waiting to be put on. Next weekend's project. Stay tuned.




Tuesday, April 29, 2014

Got the Bed Ready

 
 Worked almost 10 hours just building the bed!
And that's with lots of help with my better half. :)
 
 
 
Installing a piano hinge
takes a LOT of screws! LOL
 
Got the Bed Ready.
Now all I need is a soft mattress!
 
 
 
Underneath storage and easy to get to.
All I need to do is install the gas lift supports.
 
 
 
 

Sunday, March 23, 2014

Inside Lighting


His and Hers bedroom reading lights
 
3 LED puck lights over the kitchen area
 
1 of 2 original lights over seating area
 
Second original light over seating area on opposite side
 
Swivel lights over kitchen table

Starting the Plumbing

 
 
Man that is some tight spaces, but got the sink drain hooked up and working!

I don't have a grey water tank, so here you hook up a hose and drain into a portable tank.

Finishing up the inside electrical

March 2014

Wiring Up


Still some tidying up to do, like cutting off all those zip tie ends.


Main entrance into the electrical panel where the inverter is located



All wiring runs to the inside  and through conduit for easier access


This will be covered by a finished kick board.